Power outage procedure
Bold textThis page is a work in progress
E-line area
1.1
E-Line tool
Is the green light on at the side of the tool (see ?g ?gure 2). If green the tool should be up and running. Check the computer (see ?gure 3) for the error report program 'ausman' to see that all systems are up and running. If it reports no other errors than power loss everything should be ok.
1.1.1 E-line power on/off
Turn off
1. Login as administrator on pc (see ?gure 3) 2. Shut down gun. 3. Shut down EQ software. 4. Shut down EM-server program. 5. Turn o? pc. 6. Press the yellow button on the side of the E-line (see ?gure 2). 7. Take out airlock wire on the other side. 8. Press the red button besides the yellow (see ?gure 2). 9. (Can turn of the main switch, big black one).
Turn on
1. (If the main switch is o?, turn it on). 2. Plug in the airlock wire. 3. Press the yellow button - wait one minute. 4. Press green button after waiting one minute. 5. Wait for computer to boot up. 6. Log in as admin?
1.2 E-line clean room
Look at the red switch (see [fig:power-switch-clean]) is it on. If on everything should be running fine.power switch clean room If of try switching it on again. Lights should turn on. If there is no response when turning the switch you need to open the fuse cabinet inside the clean room (see [fig:fuse-cabinet]). When you have the cabinet open there should be a black switch that is pointing down (see [fig:Fuse-switch-E-line] ) switch it back up, and try to turn the red switch again. If the system starts up for a second and then turns off (this happens some times) repeat the process with the black and red switch until it works.